Harnessing the sun to power a sustainable future

Solar Energy

Blessed Investment Group develops solar energy projects that transform sunlight into reliable, sustainable power. Through innovative technologies and strategic investments, we deliver efficient energy solutions that reduce environmental impact while supporting long-term growth and energy independence.

We redefine
what’s possible

Project Blue 1

Project Blue 1 is a groundbreaking project in Albania’s energy production, marking the first and largest privately owned photovoltaic park in the region.

Located in Fier Municipality, about 120 km from Tirana, it operates independently from government subsidies, selling all its electricity directly to the market. The park benefits from Albania’s highest solar radiation levels, thanks to its unique microclimate and favorable soil conditions.

Project Blue 1, with a total installed capacity of 67 MWp DC, became fully operational on May 24th, 2024, and is managed by ABKONS for its operations and maintenance. The project has a technical lifetime of over 25 years, with a minimal degradation rate of 0.3%. Additionally, feasibility studies for energy storage solutions are underway, further enhancing the project’s sustainability. A development assistance agreement has been signed with the Ministry of Infrastructure and Energy for a 49-year partnership. 

Project Blue 2

Project BLUE 2 —114 MWp DC (Target 100 MW AC)- BESS 60+ MW

BLUE 2 is not just a project —it is a platform expansion

Project Blue 2 – phase 1 is operational since Aug 2025

Project Blue 2-phase 2 is under construction and will become operational October 2026.

Project Blue 3​

Located in Fier, Albania, will have a capacity of 36 MWp AC / 42.5 MWp DC. The project was awarded in June 2024 through a competitive auction by the Ministry of Infrastructure and Energy (MIE). A Project Development Agreement (PDA) was signed in November 2024, with construction set to begin in May 2025 and expected to take 24 months. The 59-hectare site is secured under long-term lease agreements, and a 15-year Power Purchase Agreement (PPA) has been secured with MIE. 

Project Blue 4

Location: Fier, Albania

Capacity: 111 MWp AC / 134.5 MWp DC

Permitting Status: In progress, with a preliminary approval application submitted to the Ministry of Infrastructure and Energy (MIE).   

Armen Solar

Location: Vlorë, Albania

Capacity: 30 MWp AC / 40 MWp DC

Land Secured: 42 hectares

Permitting Status: Ongoing, with a preliminary approval application submitted to the Ministry of Infrastructure and Energy (MIE).